Complete demolition

A house, garage or outbuilding to remove. Define the boundaries before the machinery arrives.

Request a quote
Illustration: complete demolition preparation.
Illustration: two people in Demotek workwear review a building plan outside a house and garage.

Prepare your quote

  • Plans of buildings to remove and parts to retain
  • Known access width and boundaries with neighbours
  • Slab, foundations and final ground level to specify

The demolition area

Site access, neighbouring buildings and structural condition determine the approach. Connections, permissions and potentially hazardous materials must be identified before work starts. Demolition, sorting and removal form part of a clearly defined assignment.

A detached garage, an attached extension and a terraced house have different constraints. Identify the parts to remove, walls that will remain exposed and shared access. This separates building demolition from foundation removal, protection and reinstatement work.

Points to clarify for your quote

State whether the project includes the slab, foundations and ground levelling. Mention any tank or live connection. Specify the final condition you expect: demolishing a building does not automatically leave a site ready to rebuild. If part remains occupied, identify access and supplies that must be maintained.

Prepare the site for what comes after demolition

Define what will remain after the work

Explain the next project: rebuilding, a new access, a garden or a site left vacant for now. Distinguish the building, slab, foundations and external works. Complete demolition of a building does not automatically specify removal of every underground structure. Have expected levels and exclusions clarified using the information available.

Identify connections to neighbouring buildings

Share existing plans and flag shared walls, roof junctions, common passages and known services. State which access routes are available and which still need agreement. Have the appropriate professionals define protection for retained parts and any repairs needed after the buildings are separated.

Locate utilities before removing foundations or excavating

Before removing foundations or excavating, have utilities identified and arrange their disconnection with the relevant operators. Obtaining plans and removing connections are separate steps.

  • Flanders: unless a statutory exemption applies, a KLIP plan request is required before groundworks. The required information must be received before work starts.
  • Wallonia: for works on public roads, the Walloon Public Service reiterates the duty to request utility plans and refers to KLIM-CICC for the networks it describes.
  • Brussels: Sibelga distinguishes removing a meter from removing the entire gas or electricity connection. Have the intervention needed for demolition confirmed.

Arrange the site handover

Before work starts, agree how completion will be recorded: cleared areas, retained structures, disposal and outstanding items. If another company will build afterwards, share the scope boundaries and site information gathered. A site cleared after demolition does not itself confirm that the conditions required for new construction have been met.

Demolition plan and completion certificate: different documents

In Flanders, the sloopopvolgingsplan prepares waste identification and tracking. For sites subject to this tracking process, the sloopattest certifies removal of the waste using the collected records. Before work starts, clarify who collects these records and supplies the certificate before handover, under the conditions applicable to the project.

Plan sorting and items to salvage

Before work starts

In Flanders, demolition generally requires a permit, with conditional exemptions. In Brussels and Wallonia, also check the applicable procedure with the municipality before setting a start date. A quote is not permission to demolish.

Asbestos rules and official sources

Your questions

What does “site reinstated” mean in a quote?

Have the final condition specified: materials removed, excavations left open or backfilled, proposed fill materials and final level. Identify underground structures left in place and documents to pass to the designer of the next project. Level ground does not establish that the site is ready for new foundations.

Does demolition include the ground slab and foundations?

Only when these items are included in the agreed scope. State whether the slab should remain, how deep foundations must be removed and the condition you expect the site to be left in. These choices affect the equipment and waste removal.

What should I describe for an extension attached to the house?

Mention shared walls, connections to the roof and utilities passing through the extension. Identify what must remain before work starts, including the protection and repairs to coordinate with other contractors.

Let’s discuss your project.

Tell us about the work and the site location.

Request a quoteinfo@demotek-group.be