Asbestos in Flanders
A non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
Approved asbestos removalIdentify suspect coatings before drilling, sanding or stripping walls and ceilings.
Request a quoteCheck our approval with FPS Employment (French)

The Asbestos Fund lists certain plasters and wall coverings among known applications. Age or appearance alone cannot establish composition. A room may contain successive finishes and repairs: a result at one point does not automatically describe every wall and ceiling. Locate both surveyed areas and those affected by renovation. Removing plaster does not resolve the structural stability of its wall.
Describe affected walls and ceilings, known height, retained finishes and work after removal. Specify occupation and equipment to keep running. Separate asbestos removal, service alterations, structural work and repainting.
Specify whether the work covers a whole room, a ceiling or selected walls. Floor area is not the same as the plaster surface to be removed. Supply measurements already available and report references, identifying areas that have not been examined.
Radiators, lighting, fitted furniture and frames may affect access to surfaces. Identify what must stay and work planned for the electrician or heating engineer. Any dismantling must be prepared without drilling or scraping suspect plaster to make the work area accessible.
A wall is not automatically ready to paint after asbestos removal. Distinguish its condition after removal from repairs, new plaster and decoration. Include any planned wall chasing or opening: it may affect additional layers or elements.
OVAM lists asbestos plaster removal among work for approved companies. The method follows risk assessment. The Code on Well-being at Work requires identification of suspect materials before workers intervene; an unrecorded discovery requires the external contractor’s employer to stop work in affected and potentially contaminated areas, with prerequisites before resumption.
Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.
Asbestos plaster removal can affect several surfaces in one room. Have the enclosure boundaries defined. Understand enclosures, respirators and checks
Asbestos rules and official sourcesA non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
The inventory must cover the proposed work. Materials, condition, quantities and method determine any declaration or permit.
Provide materials and quantities for the whole project to confirm its environmental classification and waste route.
A standard asbestattest is based on a non-destructive inspection. OVAM explains that additional investigation is needed when work exposes concealed layers. Match the report references to the ceiling and supports the work will actually affect. A reference to one room does not automatically cover every finish layer; do not detach plaster to investigate it yourself.
A photograph or the number of rooms cannot settle this. Access and occupancy conditions must be defined for the project. Mention shared passages and essential facilities, and ask when occupants and other trades may return to the affected areas. Do not assume that an adjoining room can be used without confirmation of the planned arrangements.
To compare offers, ask for a scope per room and identified layer. The quote should specify surfaces, height and access, area preparation, removal, planned checks and waste. Check whether stripping back, replastering and painting are included. Do not compare a removal-only amount with a quote covering the entire renovation.
No. A crack describes the condition of a surface, not its composition. Have the situation assessed without detaching a piece. If the ceiling’s stability is also in question, report that separate concern to the person responsible for the building.
A material identified in one room does not establish the situation throughout the house. The scope depends on the identified materials, their condition and the planned work. Ask for the quote to distinguish surfaces being removed from those being retained.
Not automatically. Removing asbestos-containing finishes and altering a wall are separate items. For an opening, also have the wall’s structural role, required assessments and permissions confirmed before coordinating the contractors.
Distinguish plaster at the opening, the frame seal and glazing putty. Their composition and report references may differ. State whether the windows stay or are replaced, then ask who makes good the junctions after removal.
Not automatically: plaster and boards installed below it are separate materials. Compare report locations and descriptions with the area to be removed. Flag unexamined elements without opening the ceiling to show them; the professional will determine what further investigation is needed.