Asbestos cladding before external wall insulation

Before adding external wall insulation, have the existing facade slates or panels and affected elements identified. Coordinate any removal, access and temporary wall protection with the new finish.

Request a quoteCheck our approval with FPS Employment (French)
Illustration: two people review a plan from ground level beside an intact slate-clad facade without touching the cladding.
Illustration: two people in Demotek workwear review a building plan outside a house and garage.

Prepare your quote

  • Elevations and materials located in the report
  • Height and available access from the street
  • Windows, services and property boundaries
  • Wall handover and protection between contractors

Cladding, facade slates and layers behind the panels

OVAM describes asbestos-cement slates and panels among older facade coverings. Appearance alone cannot confirm what your cladding contains. Distinguish visible panels, fixings, framework, insulation and the wall behind. A roof report does not automatically describe the gable. Flag elevations renewed at different times and layers not examined; compare the insulation design with the survey’s actual coverage.

Points to clarify for your quote

Provide available drawings or dimensions, the affected elevations and report references. Mention windows, downpipes, cables, terraces and neighbouring passages. Separate removal, waste, work-at-height access, temporary protection and new insulation in the quotes.

Plan removal before external wall insulation

Describe access to each elevation

A street-facing facade and a gable beside a narrow passage need different access. Identify obstacles, property boundaries and routes used by residents. Clarify installation and use of access equipment and any permissions required. Do not assume the facade contractor’s scaffolding automatically covers the asbestos removal phase.

Agree the wall’s condition after removal

The new insulation system may require repairs or substrate checks. Establish who performs them, who protects openings and the wall from weather, and who approves the next stage. Removing the cladding does not mean the substrate is ready for every insulation system.

Before work starts

Have the removal method and procedures for your region checked. Demotek prepares asbestos removal; insulation, new fixings and facade finishes need explicit responsibility within the project.

Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.

Asbestos rules and official sources

Your questions

Can external insulation be fitted over asbestos facade slates?

In Flanders, OVAM prohibits new structures over external asbestos-cement coverings regardless of their fixings. Have the cladding assessed before choosing that approach. Specify the removal required and the new facade system under the rules for the region where work takes place.

Which Flemish grant covers asbestos facade removal?

The former €8/m² facade bonus was limited to applications submitted before 1 July 2025. Removal can still count as renovation work under Mijn VerbouwPremie’s external wall category, alongside sufficient new insulation. For an eligible home or private apartment unit, a category 3 owner-occupier can receive up to 35% of eligible costs excluding VAT, capped at €3,500. For category 4 or letting to a housing company, the rate is up to 50%, capped at €5,000. These caps cover insulation and renovation together. Confirm your category; common parts follow a separate scheme.

Asbestos in Flanders: certificates and renovation

Which documents are needed for the external wall insulation grant?

For Mijn VerbouwPremie, prepare the final invoice, any advance or interim invoices and the contractor’s insulation certificate. The final insulation invoice must be no more than two years old when applying. For external insulation, the new layer must reach at least Rd 3 m²K/W; existing insulation does not count towards that minimum. Keep the file for two years after the grant is paid, with payment records and before-and-after photographs available for inspection. Have removal, insulation and finishing costs listed separately in the quote.

Do materials behind the cladding also need assessment?

Have it checked whether the work affects framework, insulation, membranes or concealed boards and whether the report covers them. Flag inaccessible areas without removing a panel yourself. The professional determines further investigation; visible panels do not establish the composition of every layer.

Asbestos removal before renovation

What needs coordinating if the windows are replaced too?

Locate the affected openings and share the same drawing with the contractors. Distinguish cladding, window sealants, sills and the new insulation junctions. Assign temporary closure and weatherproofing of openings so these tasks remain covered between contractors.

Asbestos window putty: before replacing windows

How do I compare asbestos facade removal quotes?

Compare the same elevations, known areas and layers to remove. Ask whether work-at-height access, protection, waste and wall handover are included. Separate asbestos removal from insulation and new finishes, and identify assumptions about unexamined areas.

Asbestos removal costs: compare quotes

Let’s discuss your project.