Approved asbestos removal
FPS Employment
EN
Illustration: Demotek workers in protective clothing beside a marked asbestos removal area.

Approved asbestos removal · Belgium

DEMOTEK.

Asbestos removal.
Prepare the next step.

Roofs, facades and interiors.
Demolition and selective strip-out, too.

Based in Overijse. Working across Belgium.Explore our services

Our services

Replacing a roof, renovating an interior or removing an outbuilding? Explore the materials involved, checks to arrange and information needed for your quote.

Illustration: preparing a protected work area.

Our approach

Your project starts with a clear scope: materials to remove, spaces to protect and parts to retain. Available reports help identify missing information before the intervention is defined.

  1. 01

    Describe the project

    Give the municipality, parts to remove and parts to retain. Existing plans, photographs and surveys help us understand the building and access.

  2. 02

    Define the work

    Distinguish prior checks, work and waste removal. The quote should specify protection, exclusions and coordination with other professionals.

  3. 03

    Prepare the next step

    The schedule accounts for formalities and site availability. Agree the expected final condition and completion documents beforehand.

Asbestos removal may precede a roof renovation, strip-out or demolition. From the first discussion, identify the professionals already involved and parts of the building still in use. Agreeing who does what and when helps prepare the handover between trades.

Find the next step for your project

Concerned about asbestos?

Three answers to understand where to start, before any work.

A guide to next steps, not a diagnosis. The colour does not measure exposure risk.

Where is your site?

Where is your site?

Requirements vary by region.

Asbestos regulations
What the rules say

When a company’s workers are involved, asbestos must be identified in the work area before they intervene. If in doubt, an asbestos survey expert must assess the situation. The building’s age alone cannot rule out asbestos.

FPS Employment: pre-work survey (French)

Flanders

In Flanders, an asbestos certificate does not automatically replace the assessment needed before renovation or demolition. Check whether the planned work and hidden materials are covered.

Read the official guidance

Brussels

In Brussels, check the asbestos survey and environmental permit requirements for the planned works before removal starts.

Read the official guidance

Wallonia

In Wallonia, check the applicable permit or declaration and waste requirements before removal. The procedure depends on the work.

Read the official guidance

Sources reviewed on 25 September 2026.

Rules in your region

From Overijse, we discuss projects in Flanders, Brussels and Wallonia. The site’s location determines some of the formalities.

Flanders

In Flanders, material condition and method determine the required competence. An inventory of the work area and applicable notifications form part of preparation. A standard asbestos certificate uses a non-destructive inspection: renovation may require further investigation of concealed materials. Methods other than simple treatments require an approved removal contractor.

Check the environmental/planning permit or exemption with the municipality. Certain projects require a demolition follow-up plan. Sort material streams and plan hazardous-substance removal before the affected demolition stage.

Brussels

Asbestos work may require specific environmental formalities. The application, quantity and method determine the file. The required site inventory must cover affected areas and be prepared independently of the removal company. A visual inventory for routine building management does not replace it.

For demolition and alterations, pay particular attention to inventories, prior removal of hazardous materials and waste separation. Also have the planning conditions specific to your building confirmed.

Wallonia

Check the applicable environmental classification and any declaration or permit. These depend on the activity and site. Contractor competence and the asbestos-waste route must also be defined beforehand.

Have the municipality confirm planning permission or exemption. If the project also requires an environmental permit, a combined permit application is necessary. Prepare a description of work and affected materials to clarify formalities before setting a start date.

Precise obligations are reviewed for each assignment with the competent authority. Sources consulted in September 2026.

Based in Overijse. Working across Belgium.

Let’s discuss your project.

Tell us about the work and the site location.

Request a quoteinfo@demotek-group.be