Asbestos in Flanders
A non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
Approved asbestos removalCheck pipes, insulation and equipment surroundings before replacing services in a confined room.
Request a quoteCheck our approval with FPS Employment (French)

A cellar may remain essential for heating, water, meters or storage. Identify equipment reached through the affected area and shared passages. Preparation covers the identified material, proposed removal and installations whose use needs coordination with other professionals.
Specify whether the request concerns one pipe, several networks or the entire room. Mention the report and installations to keep running. Distinguish insulation removal, the heating engineer’s work and new insulation; do not handle the material to prepare your enquiry.
Fictional example: ‘We plan to replace the boiler. The report identifies insulation on pipes at cellar-ceiling level, but we do not know whether the junctions were assessed. Access is via an internal staircase and the heating serves two homes.’ This describes the project without making your own diagnosis. Add the relevant report page references and identify missing information.
Give the heating installer and removal contractor the same scope: affected pipe sections, retained equipment and intended return to service. If their quotes describe different work, seek clarification before confirming dates. Responsibility for supplying new pipes or insulation should be explicitly assigned to a contractor.
Have the documents checked against materials affected by the work. Location or a photograph cannot confirm asbestos. The method and required competence depend on the material and its condition and must be established before work.
Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.
In a cellar, airlock space and access to installations matter when planning a sealed enclosure. Understand enclosures, respirators and checks
Asbestos rules and official sourcesA non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
The inventory must cover the proposed work. Materials, condition, quantities and method determine any declaration or permit.
Provide materials and quantities for the whole project to confirm its environmental classification and waste route.
The request can concern one pipe, but its length alone does not define the job. Have the insulation identified and clarify affected adjacent parts, protection and putting the heating back into service. An insulation-removal quote does not automatically include replacing the pipes or installing new insulation.
Do not tidy up in contact with suspect materials to prepare for the visit. Describe stored objects and available passages. The scope, objects to move and access conditions will be defined after assessment. Targeted asbestos removal does not automatically mean treating the entire cellar.
Notify the building manager or co-ownership representative and identify the area involved. Specify which homes the pipes serve and which access routes are shared. Coordinate removal with the heating contractor and information for occupants; an individual request does not automatically cover shared equipment.