Asbestos in Flanders
A non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
Approved asbestos removalReplacing old sheet vinyl or uncovering suspect tiles and adhesive? Have the affected layers assessed first. Distinguish the covering, its backing and the adhesive to prepare removal and the new floor.
Request a quoteCheck our approval with FPS Employment (French)

The Asbestos Fund lists vinyl tiles, adhesives and certain coverings among possible applications. This does not mean every old tile or black adhesive contains asbestos. Analysis of a tile does not necessarily describe the adhesive beneath. Supply the full report and locations examined. Separate covering removal, identified adhesive removal and the expected screed condition; coordinate the new floor with your installer.
Describe the room, approximate known area, layered coverings and anything already removed. Identify everyday passages and the planned date for the new finish. The quote must specify affected layers, waste management and handover conditions for the installer.
Recent tiles may cover an older floor. Specify whether the report describes tiles, sheet vinyl, its backing or adhesive. Distinguish layers described in the report from materials whose composition is unknown. Mention earlier renovations and areas already opened, without continuing removal. A test result should not be applied to a different material without assessment.
Flooring may continue beneath fitted furniture, along a corridor or into another room. Specify thresholds, skirting to retain and access to other rooms. Mention known underfloor heating and installations that restrict access; do not lift the flooring to locate them.
Ask the installer what substrate the new flooring requires, then clarify which items each quote includes. Adhesive removal, screed repairs, levelling and laying the new floor are separate operations. The schedule must allow for the area to be released before the next contractor starts.
OVAM lists removal of asbestos adhesive from screed requiring mechanical treatment among work reserved for approved companies. The method follows risk assessment. For work involving employees, the Code on Well-being at Work governs prior identification and unexpected discoveries. These site obligations go beyond holding a Flemish asbestos certificate.
Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.
For asbestos adhesive, the removal method and containment must be defined before any work on the substrate. Understand enclosures, respirators and checks
Asbestos rules and official sourcesA non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
The inventory must cover the proposed work. Materials, condition, quantities and method determine any declaration or permit.
Provide materials and quantities for the whole project to confirm its environmental classification and waste route.
Yes. Some older sheet vinyl has an asbestos-containing backing, as described by the Dutch public information centre IPLO. This does not establish what your floor contains: appropriate identification is needed. Do not turn the flooring over or peel up a corner to look at its underside.
Have the existing floor and planned work assessed before choosing. Substrate preparation, thresholds and skirting may affect layers that appeared suitable to retain. Share the installer’s requirements with the assessing professional. A new covering does not, by itself, resolve the management of retained materials.
No. Colour alone is insufficient. Have an expert review the documents and area and decide which checks are needed. Describe the adhesive as suspect until its composition has been established.
Check which materials were actually covered and the inspection’s limits. In Flanders, an asbestattest addresses normal building use; concealed layers affected by work may need further investigation. Having the document is not permission to lift or sand the floor.
The area alone does not describe the layers to remove, access or necessary protection. You can explain the project without a report to clarify missing information. The scope and method must be established before a precise removal quote can be prepared.