A non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
Approved asbestos removalHave the putty and materials affected by removal assessed before replacing old windows. Define any asbestos removal and the window installer’s next steps before the existing frame is dismantled.
Request a quoteCheck our approval with FPS Employment (French)

Brussels Environment lists window joints and mastics among possible asbestos applications. This does not mean that every old sealant contains asbestos. Distinguish glazing putty, the seal between the frame and masonry, the sill and surrounding plaster. These may have been replaced at different times. The report needs to locate the material actually examined; a result for adjacent plaster does not automatically describe the putty.
Official sources
List the windows by floor and elevation, dimensions already known, outside access and occupied rooms. State whether only the glass or the complete frame will be replaced. Separate removal, waste, temporary closure, new windows and plaster repairs in the quotes.
Use simple references on a plan: street elevation, first floor, left window, for example. Match analysis references to those locations. Mention windows renewed at another time and areas not examined. Ask for a removal quote covering the same openings as the window installer’s quote.
Who closes and protects the opening if installation does not immediately follow removal? Who checks the usable dimensions afterwards? Agree these points, access and handover before booking dates. Rain protection, securing the home and internal finishes each need an assigned contractor.
The removal method depends on the product, its condition and the planned work. Have the required competence and procedures checked for your site. Demotek prepares asbestos removal based on identified materials; explicitly assign supply and installation of new windows to the window contractor.
Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.
Asbestos rules and official sourcesA non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
The inventory must cover the proposed work. Materials, condition, quantities and method determine any declaration or permit.
Provide materials and quantities for the whole project to confirm its environmental classification and waste route.
No. Grey, brown or black colouring cannot identify asbestos. Have the product compared with the report descriptions. If further analysis is needed, have a professional arrange sampling without removing a piece yourself.
Official sources
Yes. Explain exactly what the glazier needs to remove. Keeping the frame does not mean the putty or seals will remain intact. Have the affected materials assessed before work and identify previously replaced panes, which may have different products around them.
Not automatically. Plaster, the perimeter seal and glazing putty are separate elements. Ask the professional to compare the report’s coverage with the planned removal. Plaster repairs should also be specified separately from asbestos removal.
The window count alone is insufficient: specify identified products, affected openings, height and access. Ask which frames or panes are removed with the material, how waste is handled and the condition in which the opening is handed over to the window installer.
Flag the junction to the window installer and removal contractor. Ask which panels, fixings and finishes around the opening will be affected. A putty assessment does not automatically cover cladding. Agree the work sequence, temporary closure and junctions with planned insulation.