A non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
Approved asbestos removalIdentify suspect layers before removing tiles, floors, walls or ducts.
Request a quoteCheck our approval with FPS Employment (French)

Replacing a basin affects different elements from removing a floor or moving a partition. Separate fixtures from finishes and substrates. Existing analyses must match materials actually affected; a partly renovated room can retain other unexamined layers.
State whether you are replacing fixtures only or also floors, partitions and ducts. Identify completed analyses. Specify water and bathroom access needs, then have removal, waste and reinstatement distinguished in the quote.
Fictional example: ‘We are replacing the bath with a shower and changing the floor tiles. The report covers an adhesive, but the wall behind the bath was not assessed.’ Mark the new project’s areas on the available plan and distinguish known results from unassessed parts. Do not remove equipment or tiles to expose those layers before assessment.
Mention whether the room contains the home’s only toilet, shower or cooking facility. Ask what interruptions are expected and when other trades can start. Separate removal, checks of the area, plumbing or electrical work and finishes in the schedule. Completing removal does not mean the facilities are immediately usable.
Have the documents checked against materials affected by the work. Location or a photograph cannot confirm asbestos. The method and required competence depend on the material and its condition and must be established before work.
Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.
Asbestos rules and official sourcesA non-destructive asbestos certificate may leave concealed layers outside its scope. Have the areas to be opened assessed before renovation.
The inventory must cover the proposed work. Materials, condition, quantities and method determine any declaration or permit.
Provide materials and quantities for the whole project to confirm its environmental classification and waste route.
Clarify how deep the removal will go: tiles, adhesive, underlying layer or substrate. Analysis of one layer does not automatically describe the others. Give the expert existing sample references and the renovation plan. Do not lift a tile to complete your enquiry.
Asbestos removal, dismantling fittings, plumbing and new finishes are separate tasks. Clarify who handles each stage and when other trades can enter the area. Asbestos removal alone does not deliver a finished bathroom.
The project needs to be reorganised around the affected materials, not automatically abandoned. Clarify what must be removed, what will remain and the sequence of contractors. A positive result for an adhesive does not define the scope of the entire room or the duration of the work.
Specify whether the project removes the covering, moves sanitary fittings or changes thresholds. Have the report checked for coverage of the vinyl, backing and adhesive without lifting the floor. Identify fitted furniture and passages the installer will work on so all affected layers can be planned for.