Opening walls & removing partitions

Distinguish a partition from a structural wall before planning the opening.

Request a quote
Illustration: opening walls & removing partitions preparation.
Illustration: an operator in Demotek workwear uses a wet concrete saw on a construction site.

Prepare your quote

  • Plans and required opening width
  • Wall function to be confirmed by a specialist
  • Reinforcement, services and finishes to coordinate

The wall’s role

Structure, material, access and retained finishes determine scope. Required studies and permissions depend on your project. Separate cutting, any reinforcement, removal and finishing repairs: a rough opening is not a fully finished passage.

A partition divides rooms; a wall may also carry loads or be shared with a neighbour. Opening width, floors above and known services form part of the project. Define responsibility for the study, temporary support, reinforcement and demolition before agreeing a date.

Points to clarify for your quote

Gather available plans, required dimensions and service information. A photograph or wall thickness alone cannot establish whether it is load-bearing. Mention any party wall, occupied room or finish to protect on the other side.

Describe the intended result between the rooms

Open passage, doorway or joining rooms

Specify whether you want a passage, a door or the entire dividing wall removed. Share the available layout plan: circulation, fixed furniture and equipment help define the intended result. Distinguish the clear finished width from the rough opening. Coordinate the choice of door or frame before the professionals responsible for the project finalise dimensions.

Junctions easily overlooked in a quote

Compare floors and ceilings on both sides: levels, coverings and finishes may differ. Mention radiators, switches and sockets on the wall. Ask who handles each junction after the opening, including skirting boards and the transition between floors. A separate item or explicit exclusion is clearer than assuming demolition includes completely refurbishing both rooms.

Load-bearing walls in Flanders: permission and architects

Under the rules effective from 1 March 2026, replacing a load-bearing wall with a beam in Flanders may qualify for a permit exemption, subject to conditions. Structural work still requires an architect for design and supervision. Check the conditions and local rules with the municipality before scheduling the opening.

Prepare the dimensions and scope of concrete cutting

Before work starts

Gather available plans and specify the required opening width. Check applicable formalities with the municipality. In Flanders, an opening affecting structural stability requires an architect; procedures depend on region and work.

Asbestos rules and official sources

Your questions

I want to open a wall. How can I tell whether it is load-bearing?

Wall thickness or a photograph is not enough. Have the plans and structure assessed by a competent professional before demolition. The opening and any reinforcement must be planned together.

Does a rough wall opening include the finishes?

Not necessarily. Clarify plaster repairs, floor and ceiling junctions, and painting. Supplying a door or frame is also a separate item. A clear quote states the expected condition after the work and the tasks left to other contractors.

Let’s discuss your project.

Tell us about the work and the site location.

Request a quoteinfo@demotek-group.be