Asbestos in apartments and common areas

Plan asbestos removal in an apartment building with the property manager or co-owners’ representative. Identify materials, affected shared areas and access requirements before agreeing the schedule with residents.

Request a quoteCheck our approval with FPS Employment (French)
Illustration: a property manager and coordinator review a plan in an apartment lobby beside stairs and mailboxes.

Shared areas, apartments and communal services

Work inside one apartment may require access through the shared lobby, stairs or courtyard. Conversely, removal in the boiler room can affect several homes. Prepare a plan showing materials to remove, neighbouring rooms, circulation and services supplying the building. Ask the property manager to clarify private and shared boundaries, and identify the person who confirms the enquiry’s scope.

Prepare a usable file for the building manager

Separate the work area from building access

Mark routes for workers and waste, doors needed and passages used by residents. Mention delivery hours, accessibility needs and services shared by several units. Have the site organisation and access restrictions agreed before sending residents a schedule.

Assign responsibilities before booking contractors

Specify who opens rooms, informs residents, works on services and organises their return to use. Ask which documents will be provided at completion: treated areas, waste records and checks required for the method. Keep a record of excluded areas and those still needing assessment.

Illustration: two people in Demotek workwear review a building plan outside a house and garage.

Prepare your quote

Collect available reports, floor plans, occupied areas and heating, water or lift constraints. Appoint a contact for access and resident communication. Compare quotes using the same material references, areas and expected condition after removal.

  • Reports and private/shared boundaries
  • Access, circulation and exits to keep available
  • Communal services and interruptions to coordinate
  • Resident information and completion records
Compare quotes

Before work starts

Procedures depend on the region and the site. In Brussels, the survey required for the asbestos removal application must be prepared independently of the removal contractor; conditions also govern occupant information and access. Have the file checked before booking a start date. Demotek prepares removal based on the material assessment.

Demotek SRL (enterprise number 0783.397.239) appears on the official FPS Employment list. Approval covers glove-bag removal and hermetically sealed enclosures. The method suited to your site is defined after assessment.

Asbestos rules and official sources

Your questions

When is a common-parts asbestattest required in Flanders?

OVAM sets 31 December 2026 as the deadline for co-owners’ associations of buildings constructed before 2001. This Flemish obligation concerns the common-parts certificate, prepared through a certified expert. It is not a general deadline for removing all asbestos.

Can residents stay during asbestos removal?

This must be determined before work, based on materials, the method, access and affected services. Ask which areas will be off limits, which services will stop and the conditions for returning rooms to use. Do not promise residents they can remain before that assessment.

Asbestos removal before renovation

How do we prepare removal in the communal boiler room?

State which homes depend on heating and hot water, how the room is accessed and what the heating contractor plans. Separate insulation removal, equipment replacement and return to service. Describe seasonal constraints before agreeing an interruption.

Asbestos removal in cellars & boiler rooms

What information is needed for a co-ownership asbestos quote?

Add an area plan, shared access, occupancy constraints and the central contact to the reports. Request itemised work and exclusions, with the assumptions used. A quote for one area cannot be compared directly with one covering the whole building.

Asbestos removal costs in Belgium: quotes

What should we give the property manager before insulating a facade with suspect panels?

Collect survey references, affected elevations and the insulation design. Describe balcony access, windows and residents’ routes. Assign responsibility for access equipment, temporary protection and handover to the facade contractor so the quotes cover the same project.

Asbestos cladding: before external wall insulation