Asbestos removal. Prepare the next step.

Start with the materials, existing reports and planned work. We clarify the scope, method and organisation of your project.

Request a quoteCheck our approval with FPS Employment (French)
Illustration of a prepared asbestos roof intervention.

Our services

Materials and rooms

Your questions

How does an asbestos removal project progress from quote to completion?

Start by describing the planned work and sharing available reports. The affected materials and scope must then be confirmed to select a method and prepare the quote. Before removal, agree access, protection, formalities and timing with the contractors. The schedule should also cover waste disposal, applicable checks and release of the treated areas. Keep the agreed completion records and identify materials left in place: removing a roof does not establish the asbestos condition of the entire building.

Asbestos & renovation

Why does the removal method vary between projects?

A roofing sheet, plaster and pipe insulation need different assessments. The contractor selects the method after evaluating the material, its condition and site risks. Simple treatments are restricted to the cases and conditions set out in the regulations; glove-bag removal and a hermetically sealed enclosure require approval. Ask which method is proposed and what it means for room access and scheduling. Price or surface area alone cannot determine the choice.

Can asbestos removal be planned for just one room?

Describe the room, the materials your renovation will affect and what you want to keep. Have a professional assess whether limited removal is compatible with their condition, neighbouring areas and subsequent work. The room’s boundaries may not match the extent of the material or the area requiring protection. The quote and completion records should identify what was treated and what remains. Partial removal does not establish that the whole house is asbestos-free.

Asbestos & renovation

How should the asbestos contractor and roofer coordinate their work?

Share the removal scope and new roof plans with both companies. Allocate responsibility for work-at-height access, temporary weather protection and checking retained supports. Agree who confirms that the area is available and how delays or discoveries beneath the roof covering would affect the schedule. The roof structure, insulation and new covering must be explicitly included in a quote or assigned to another contractor. A quote for asbestos removal alone does not automatically include them.

Asbestos roofs

My certificate says ‘asbestveilig’. Can I renovate without further checks?

No. In Flanders, ‘asbestveilig’ does not necessarily mean asbestos-free. The certificate describes normal building use and may list asbestos materials. The standard inventory is non-destructive. Before opening a wall or removing a floor, check whether affected parts were examined and whether further investigation is needed for the work. This Flemish framework does not replace procedures for a Brussels or Walloon site.

Asbestos & renovation

Can I contact you before I have an asbestos survey?

Yes. Give the municipality, part of the building and intended work, and state that no report is available. This first discussion clarifies missing information; it does not replace identifying materials before work. For worker protection, preparing or extending the inventory is an asbestos inventory expert’s responsibility. You do not need to dismantle a panel or take a sample to contact us.

Asbestos & renovation

Can we stay in the house during asbestos removal?

Do not plan to remain without approval from those responsible for the site. Describe occupied rooms, shared access and essential equipment. Ask which areas will be inaccessible, how passages will be arranged and who confirms they can be used again. The answer must be specific to your site; a small removal area or work confined to one room cannot guarantee continued occupation.

Asbestos & renovation

What does asbestos removal cost per square metre?

Area alone is insufficient: material, condition, removal method, access and disposal determine cost. Protection and site setup are still needed for a single room; a whole-house price cannot simply be divided by area. For a roof, compare the same items: work at height, removal, transport and waste treatment. Have analyses, new roofing and interior reinstatement priced separately.

Asbestos roofs

What should I do about suspect pipe insulation in a cellar?

Pipe insulation is the covering around pipes or heating installations. Some old insulation contains friable asbestos; a photograph cannot confirm this. Do not scrape the covering. Establish the material and required competence before arranging removal. We can first clarify your request and identify the right contact.

Asbestos pipe insulation

How do I prepare a waste-disposal-only enquiry?

State that you are requesting disposal only and give the location, identified material, already known quantity and available documents. Do not handle waste to complete this information. Acceptance, transport and the treatment route must be confirmed before a quote; an enquiry is not a collection booking.

Can wall or ceiling plaster contain asbestos?

Some plaster can contain it; appearance cannot establish this. Before drilling, sanding or removing it, check that the inventory covers these materials and planned work. An expert determines whether analysis is needed. Describe the substrate and documents to clarify the next step without sampling it yourself.

Asbestos & renovation

Is a photograph enough to identify asbestos?

A photograph may help identify a suspect application but cannot provide certain identification. Use available surveys and have a professional arrange analysis if needed. Do not take a sample yourself to request a quote.

Who is allowed to remove asbestos?

Required training or approval depends on the application, material condition and removal method. Simple treatments are carried out by companies on the relevant official list or approved companies, using trained workers. Glove-bag removal and hermetically sealed enclosures require approval. Ask who will carry out the work and with which competence.

What should I send for an initial discussion?

The site address, work description, existing photographs and any available asbestos inventory or certificate. Do not damage or move suspect material to obtain more information.

Is an asbestos certificate enough for building work?

Not necessarily. A certificate prepared for a transfer and an inventory of a work area have different purposes. Check whether available information covers materials your work may affect. Compare rooms and elements in the report with your project: lifting a floor, opening a partition or working on a pipe may affect different layers. Send annexes and stated inspection limits too.

Is my old asbestos inventory still valid?

The reform effective on 22 December 2025 does not invalidate older inventories. For worker protection, updating and extending them to the planned works still need checking. Send the complete report, annexes and changes since it was prepared.

What should I check before installing solar panels on a suspect roof?

Have the covering identified before scheduling installation. FPS Employment states that altering an asbestos-cement roof to fit panels in a way that damages the material and exposes workers conflicts with worker protection rules. Coordinate any asbestos removal, new covering and solar installation as separate items.

Asbestos roofs

Does a garden shed need asbestos removal before demolition?

Old roofing or cladding may contain asbestos even on a small shed. Identify affected materials before dismantling. Where removal is necessary, coordinate it before structural demolition. For the quote, distinguish covering, walls, frame and any slab you wish to keep.

Garage & outbuilding demolition

What if suspect material appears during renovation?

Inform the responsible person without touching the material. The employer carrying out the work must stop in affected or potentially contaminated areas and restrict access. Resumption requires analysis, updates to relevant documents and appropriate protective measures.

Asbestos & renovation

Can old floor tiles and adhesives contain asbestos?

Some vinyl tiles, underlays and old adhesives can contain asbestos. Colour, apparent age or a photograph cannot confirm it. Before removal, have the covering and affected layers checked. Do not lift a tile or sand adhesive to complete your enquiry; send existing reports and photographs.

Asbestos & renovation

Which documents should I keep after asbestos removal?

Before work, specify the documents to be provided: description of removed materials and treated areas, waste collection or treatment records and, where required, inspection reports. Requirements vary with the site and region. Keep them with the existing inventory; alone, they do not prove the whole building is asbestos-free.

Asbestos & renovation

Rules in your region

From Overijse, we discuss projects in Flanders, Brussels and Wallonia. The site’s location determines some of the formalities.

Flanders

In Flanders, material condition and method determine the required competence. An inventory of the work area and applicable notifications form part of preparation. A standard asbestos certificate uses a non-destructive inspection: renovation may require further investigation of concealed materials. Methods other than simple treatments require an approved removal contractor.

Brussels

Asbestos work may require specific environmental formalities. The application, quantity and method determine the file. The required site inventory must cover affected areas and be prepared independently of the removal company. A visual inventory for routine building management does not replace it.

Wallonia

Check the applicable environmental classification and any declaration or permit. These depend on the activity and site. Contractor competence and the asbestos-waste route must also be defined beforehand.

Precise obligations are reviewed for each assignment with the competent authority. Sources consulted in September 2026.