Approved asbestos removal
FPS Employment
EN

Asbestos & renovation

Clarify suspect interior materials before renovation disturbs them.

Request a quoteCheck our approval with FPS Employment (French)
Illustration: asbestos & renovation preparation.
Illustration: an empty room with intact surfaces and a plan on a table to prepare a survey before renovation.

Prepare your quote

  • Planned work in each room and available survey
  • Affected pipes, finishes and concealed layers
  • Removal, technical interventions and reinstatement

Materials before renovation

Some applications are concealed within finishes or technical installations. A certificate prepared for a sale does not automatically cover the entire work area. High-risk applications require an approved company. Required competence and the identity of the contractor must be established before the assignment.

A room’s name does not define the asbestos work. A bathroom may have several floor layers; a cellar may contain insulation around pipes. Describe the material and intended intervention instead of assuming one treatment suits the whole room.

Points to clarify for your quote

A kitchen, bathroom or boiler-room project can affect several layers or installations. Send the work programme with the available report to check coverage. Any removal, work on services and reinstatement must be coordinated with other trades. For pipe insulation, specify whether heating must remain operational and who will handle any shutdown and restart.

Connect your survey to the renovation programme

Turn room names into specific tasks

‘Renovate the bathroom’ does not describe every intervention. State whether you will replace furniture, remove flooring, move a pipe or open a wall. This helps match each task to examined materials and identify areas where information is missing.

Share the same records with each trade

Give the professionals involved the same version of plans and reports. Identify retained elements and the boundaries of the agreed work. If the project changes, for example with an additional opening, have the change assessed before work: it may affect material outside the area previously examined.

When must the asbestattest be renewed after work?

In Flanders, a new certificate is required within a year after unrecorded asbestos is discovered, an incident damages asbestos, or work changes the conclusion to ‘asbestveilig’. A sale requires a valid certificate. Have a certified expert assess the situation.

Coordinate common-parts documents with the property manager

A handover checklist for the next contractor

Complete these five fields with the contractors before confirming the plumber’s, electrician’s or flooring installer’s visit. This checklist helps transfer information; the required checks and permission to access the area still need confirmation from those responsible for the site.

  • Area: floor, room, plan reference and exact boundaries of the completed removal.
  • Next task: substrate affected, planned operation and elements to retain.
  • Documents: report references and versions, applicable checks and waste records supplied.
  • Open points: unexamined materials, outstanding issues, restricted access and services to recommission.
  • Confirmation: named contact, agreed access conditions and date confirmed with the contractor.

Before work starts

FPS Employment states that the survey must be suited to the work for worker protection. Some applications, including non-bonded pipe insulation, require an approved company. Appearance or a photograph cannot confirm asbestos.

Asbestos rules and official sources

Your questions

Does insulation around pipes always contain asbestos?

No. The material must be identified using available documents and, where needed, an assessment arranged by a professional. Do not open the outer covering or take a sample yourself. State the location, planned work and current use of the installations.

Is a property-sale report enough to remove a floor?

Not necessarily. Have someone check whether the report covers the floor covering, adhesive, underlying layers and other materials your project will disturb. Inspection limitations recorded in the report matter when planning further investigations.

Which materials need checking before replacing windows?

Describe glazing putty, seals around the frame, sills and plaster that removal may affect. Have the report checked for these items. Coordinate any removal, temporary closure of openings and the window installer’s work.

Asbestos window putty: before replacing windows

Should a suspended ceiling be checked before lights are moved?

Describe the boards and areas where the electrician needs to work. Changing a light can require a penetration through the ceiling or concealed material above it. Have the report checked for coverage of those elements before a tile is moved or drilling starts.

Asbestos in suspended ceilings: before removal

Let’s discuss your project.

Tell us about the work and the site location.

Request a quoteinfo@demotek-group.be